Relocation and reconstruction of power transmission system on the high-speed railway station square in Wuzhong, Ningxia
Publication Date:2025-11-06
Share to:

微信图片_2025-10-30_135843_342.jpg    微信图片_2025-10-30_135812_854.jpg

Project background: To relocate and reconstruct four 110kV power lines in an effort to push forward the development in the east area of the high-speed railway station in Wuzhong.

Supply of products:60 sets of 64/110kV cable welding heads were completed. Cable sheath restoration process was used to achieve joint-free connection.